Estimating desk open now · a person checks every DXF
Drop the DXF. See a price now, get the quote within the hour.
Laser cutting, press brake forming, PEM hardware and powder coat in Dayton, Ohio. Brackets, panels, enclosures and chassis, 1 to 5,000 pieces. Standard lead time is 5 business days.
- 5 days standard lead time, 2 days on request
- 1" steel on the 12 kW fiber laser
- 8 colors of powder in stock, any RAL to order
- 98.1% on time, last 12 months · sample
Price estimate
The DXF prices itself while you watch
The page reads your flat pattern right in the browser: the outline, every hole and slot, the cut length and the bend lines. Laser time comes from cut length and thickness, then bends, hardware and finish are added. A person still sends the real quote.
- File
- sample-bracket.dxf
- Flat blank
- 6.00 × 4.00 in
- Cut length
- 25.6 in
- Holes
- 7 holes · 8 pierces
- Net area
- 23.5 in²
- Bend lines
- 2
- Units
- Drawn in in
Zinc and anodize go to an outside shop and add 3–4 days, so 2-day turns are for bare or powder-coated parts.
$12 – $18
Order ≈ $300 – $450
Rough range for planning, ±20%. Assumes $150/h on the fiber laser, $85/h at the brake, powder at $3.50/sq ft with a $95 lot charge, programming and brake setup spread over the order (US job-shop ranges, Fabcon 2026). Not a quote.
Get the real quoteMachines
Which machines will run your part
The flat blank from your DXF, the thickness and the longest bend decide it: lasers by bed and thickness, brakes by length and tonnage. Tap any machine to see what it does.
—
Your part on our floor
Powder coat in-house
Eight colors on the shelf, any RAL to order
Parts go from the brake to our own wash and booth, so powder adds a day, not a week at an outside coater. Tap a color to price it above.
Film 2–4 mil, checked with a gauge on every rack; cross-hatch adhesion to ASTM D3359. Custom colors add $100 per order for the color change.
Design tips
Five things that make a part cost more
Our estimator marks these on almost every first flat pattern. Tap one to see where it shows up and what to change.
Quality
Proof ships with the parts
- Mill certs for every heat of A1011, A36, 304 and 5052 we cut your parts from, matched to the job number.
- First article on every new part number: flange heights, angles and hole positions measured against your drawing.
- Hardware checked with a push-out and torque-out test on the first part of each run.
- Powder film thickness on every rack, adhesion by cross-hatch; salt spray to ASTM B117 through a partner lab on request.
- Certificates on file below, with the issuer and the dates, so your supplier quality team doesn't have to ask.
| Certificate / status | Issued by | Valid |
|---|---|---|
| ISO 9001:2015 · cert. no. sample | sample registrar | to Jun 2028 |
| ITAR registration (a registration, not a certificate) | U.S. State Dept., DDTC | renewed yearly |
| Welders to AWS D1.1 / D1.3 · sample | AWS CWI, in-house | every 6 months |
| Feature (in) | Nominal | Tol. | Actual | |
|---|---|---|---|---|
| Flange A | 1.000 | ±0.015 | 1.006 | ✓ |
| Angle A | 90° | ±1° | 90.4° | ✓ |
| Hole pos. | — | ±0.005 | 0.002 | ✓ |
| Powder | — | 2–4 mil | 2.8 | ✓ |
How a job runs
From DXF to parts at your dock in 5 days
- You send the DXFHere, with quantity, material and finish. NDA first if you need it.Day 0
- Estimator checks itBend reliefs, hole distances, hardware edge distances.Within the hour
- QuotePrice by quantity and lead time, valid 30 days.Same day
- Cut and formLaser, deburr, hardware, brake. First article measured.Day 1–3
- PowderWash, coat, cure, film thickness checked.Day 4
- ShipCerts and C of C in the box, tracking by email.Day 5
Buyers
What engineers and buyers say
"Sent a DXF and a PDF at 10:40, had the price before lunch. They moved two holes off a bend line before cutting, and asked first."
Mechanical engineer · industrial controls · sample review
"Signal blue across three lots, months apart, and it matches. That used to be our biggest headache with outside coaters."
Purchasing · equipment OEM · sample review
"Hardware in, powder on, certs in the box. Five days, every time we've ordered this year."
Production planner · HVAC manufacturer · sample review
Questions buyers ask first
Which files should I send?
A DXF of the flat pattern at 1:1, with bend lines on their own layer if you can, plus a PDF with bend directions, hardware and finish. A STEP of the formed part works too: we unfold it with our own bend allowances.
Do you sign NDAs?
Yes, ours or yours, before you send anything sensitive. Tick the box in the quote form.
Can you take ITAR work?
Yes. We're registered with DDTC; controlled files go through a secure upload link, not email.
Is there a minimum order?
No piece minimum. One-off parts carry the programming, brake setup and powder lot charge, so the estimate above shows how much the second or tenth piece saves.
Can you match our color?
Eight colors are stocked. Any RAL, or a color matched to your sample, adds $100 per order and 2–3 days for the powder to arrive.
Payment terms?
Net 30 for approved accounts. New accounts pay by card or with a 50% deposit on the first order.
For sheet metal shops · from Pulsesite
What you get when a buyer sends this form
- The DXF comes with the request. Files, quantity, gauge, bends, hardware, finish, due date, NDA and ITAR flags in one email to quoting, within seconds. No more DXFs lost in a separate email.
- The flat is already measured. Cut length, pierces, blank size and bend lines arrive with the request, so your estimator checks numbers instead of opening CAD.
- Into your system. The request can go to your quoting inbox or into your ERP (E2 Shop, JobBOSS², ProShop) through email import or a webhook, depending on what it accepts.
- Your rates, your machines. The estimate uses your laser and brake rates, your gauges and your powder colors; the floor shows your real machines. Don't want prices public? The estimate switches off.
- You own the site. Domain and files are yours; if you leave us, you take it with you.
A site like this: Business plan, $1,499. Up to eight pages, your machines, your gauges, your rates. Hosting and support are optional, from $50 a month. The first shops we work with get a discount.
See all Pulsesite pricesRFQ: bracket, 100 pcs, 14 ga CRS, 2 bends, 4 PEM, powder black
Kim Alvarez · Northline Controls · kim@northline.example
Need by Dec 12 · NDA not needed · not ITAR
- bracket-flat_rev-B.dxf · 18 KB
- bracket_rev-B.pdf · 240 KB
- CustomerNorthline Controls (new)
- Qty100
- Flat blank6.00 × 4.00 in
- Cut length25.6 in · 8 pierces
- Bends2 · longest 6.00 in
- FinishRAL 9005 texture
Q-1187 · 25 / 100 / 250 pcs
1 design note on the flat · ships in 5 days · valid 30 days